Skip to main content
ZETUP PRO Corporate Services
All case studies
Technical servicesTechnical-services contractor · Dubai mainland (DET licence) · same owner group as a hotel operator

Working a stalled MOHRE labour file back to approval for a Dubai contractor

A Dubai contracting company could not get its MOHRE labour-updation application and Taqeem inspection approved after repeated filings, and two employee visa jobs were stuck behind the hold. After a further application listing all activities was filed in September, the Taqeem inspection was approved on 1 October 2026 and our PRO processing partner reported the establishment unblocked on 6 October.

The challenge

The company needed a MOHRE labour updation with a Taqeem inspection. Applications were filed on 18 May, 30 June, 27 July, 24 August and 31 August 2026 and none was approved. The Taqeem inspections of 3 August and 3 September were rejected.

Two employee visa jobs that were already under way, one new visa and one renewal, could not be delivered while the hold lasted.

Nothing in our records said why. On 8 September our own check found no MOHRE objection in the mailbox, could not tell which of three filings was live or whether the paid inspection had been carried out, and the trade licence and establishment card were not expiring, so the hold was on the file rather than an expiry.

What we did

We separated what was verified from what was assumed. The claim that the inspection had been done came from a message we had drafted ourselves, not from MOHRE, so we withdrew it. We reconciled the three transaction numbers and the fees each one carried.

A visit to a Tasheel centre on 9 September reported no block. A visit to MOHRE management on 10 September, together with the group's operations contact, produced two stated reasons: all activities must be listed, and nobody was present.

A further application was filed on 10 and 11 September with all activities listed and the operations contact's number.

Because a labour updation is required after every licence renewal, we also built a document-expiry register for the group (14 October 2026), listing licence, establishment-card, work-permit and visa dates, so the same trap does not rebuild on the other entities.

Results

Approved, 1 Oct 2026

Taqeem inspection

Unblocked, 6 Oct 2026

Establishment status reported by our PRO processing partner

2

Visa jobs held during the block, still undelivered at 14 Oct 2026

Open risk

Caution from the partner (6 Oct): technical-services licences can be blocked again without a real office

Want outcomes like these?

Every client starts with a free 30-minute PRO Health Check. No commitment, no sales pitch — just an honest review of your current setup.

Book a Free PRO Health Check
CallWhatsApp✓Free Check